The 2019 South Asian Games will be held at the National Stadium in Kathmandu, Nepal. The late finishing work of the emergency maintenance project of the stadium built by Zhonglu Sports is being carried out to ensure the completion of the task on time.
Nepal's national sports venues were built in the 1990s, including five venues: Dashrat Stadium, National Sports Center shooting range hall, natatorium, comprehensive stadium and Lanqiao table tennis Hall. Due to the damage of some facilities and equipment caused by the massive earthquake in Kathmandu on April 25, 2015, maintenance and reinforcement and technical upgrading are needed, involving more than 10 engineering fields such as civil construction, runway, decoration, lighting, power distribution, display screen, sound reinforcement system, and modern sports equipment are provided.
Since the official start of construction in July 2018, the project department has insisted on planning first, scientific deployment, and comprehensively accelerated the construction progress under the premise of ensuring safety and quality. As of July 30, except for the sound reinforcement system of Dashrat Stadium, which has not yet been constructed (because the steel structure of the rostrum built by Nepal has not yet begun construction), the other four venues have been completed, and the work has been affirmed by the Nepalese government. As the main stadium project for major events of the South Asian Games in Nepal, the Nepalese government is highly concerned. In less than a year, The Sports Project Department of Middle Road has completed the upgrading and renovation of the field lighting system, field sound amplification and public address system, large screen display system, swimming pool water treatment system, timing and scoring system, special facility system and other construction tasks for the repair projects of Nepal Dashrath Stadium plastic track, National Sports Center natnatum, shooting range hall, comprehensive stadium and Lanqiao table Tennis Hall Business. At present, the project department is carrying out the final installation and debugging of the special facilities system equipment of each specialty, waiting for the inspection of the inspection group of the Cooperation Bureau of the Ministry of Commerce.
Dashrat Stadium (Photo I)
Installation of take-off board and touchpad at Natatorium of National Sports Centre (Photo 2)
Shooting gallery debugging (Figure 3, Figure 4)