On the morning of March 21, the company held a pre-departure meeting for the construction personnel of the epidemic prevention and control and foreign aid projects, and held a farewell party for all the staff of the project department who were going to the National Stadium project of Cambodia, the stadium project of Benin and the international contract project of Benin multi-functional Stadium. Members of the company, responsible persons of departments and above, and overseas personnel of the project department attended the meeting. Xi Minjie, general manager of the company, presided over the meeting.
Xi first analyzed the current epidemic prevention and control situation at home and abroad.
Face this battle without smoke “ Epidemic ” , our company actively cooperated with the construction schedule of the general contractor, and sent many personnel from the two project departments to carry out the construction work of foreign aid projects overseas, which was practiced by Chinese people with practical actions. Love and dedication, selfless dedication ” The spirit, for the national Belt and Road foreign aid cause to go to the front line of foreign aid construction projects without hesitation, special period, reflect special responsibility. “ To overcome the difficulties of the epidemic and ensure the normal construction, the responsibility and responsibility of the staff in the middle Road are touching, they inspire us with action, we want to praise them! ” "Said Xi Minjie, general manager of Middle Road Sports. They, are Middle Road “ The contrarians ” Is the foreign aid project war “ Epidemic ” In “ Angels in white ” Is worthy of all our employees to admire and learn from the hero model!
General Manager Xi Minjie repeatedly instructed the project staff to strictly follow the epidemic prevention and control requirements, actively cooperate with the general contractor's epidemic prevention and control work flow, and implement various epidemic prevention measures to ensure the health and safety of personnel while ensuring the smooth implementation of the project. The company is the strong backing of everyone, you charge in the front, we guarantee the rear, I believe that with the active cooperation and joint efforts of all the employees of the company and the project contractor, we will win the battle “ Epidemic ” The final victory, successfully completed the construction task, safe and victorious return.