Ulaanbaatar Stadium as “ A bridge of China-Mongolia friendship ” Since it was completed and put into use in 2010, the bridge has been in safe and normal operation for more than eight years. It has held more than 1,300 activities of various types and accommodated up to 1.5 million people, making it the largest gymnasium in Mongolia. In the past two years, due to the lack of large-scale maintenance and overhaul, some facilities of the stadium are obsolete and damaged, which can not meet the needs of the stadium to hold large-scale activities.  

 

At present, the exterior of the stadium building is relatively depressed and has lost its original bright appearance. The marble of some ancillary buildings around the stadium has fallen off, the decorative surface of the wall pillars has been convex and convex, the glass of doors and Windows, the locks and doors have been fixed and sealed, and some facilities such as courtyard lights and street lamps have been damaged to varying degrees.

 

 

Our company mainly involves in the renovation of wooden floor, replacement of lighting system, update of sound reinforcement system, LED large screen, time scoring system upgrade, public address system, integrated wiring system, video surveillance system, cable TV system and mechanical and electrical equipment system installation and update of sports equipment upgrade.

 

Update on outdoor flooding lighting

 

some outdoor lamps are damaged

 

Damage of wood floor in part of interior

 

Due to the fact that the interior of the stadium is currently leased to the Mongolian National Television, many of the lighting stage equipment, the main stadium and many rooms in the stadium are not accessible until December 20, 2012 due to renovation. After getting familiar with the construction drawings of the various systems of the project, the project manager prepared the "Plan for On-site Verification of electromechanical and Sports Technology", sorted out and prepared the information and equipment required for on-site verification of the project.

 

(items placed by the tenant in the stadium)

 

(check out the construction drawings in the dorm)

 

 

In order to ensure the health and safety of the on-site personnel, the project department strictly screens the health qualification certificate of the personnel entering the field according to the local epidemic situation, regularly carries out nucleic acid testing of all personnel, and is equipped with new goggles, gloves, masks, wipes and other epidemic prevention supplies to guard the epidemic prevention safety gate for the entry of the project and subsequent construction.

 

 

Mongolian aid Ulaanbaatar Stadium repair and renovation work has done a detailed deployment and arrangement, in the face of unknown problems, the Middle Road sports Mongolia project team will surely rise to the difficulties, “ One Belt, One Road ” Building bricks, in the new era of the new journey, bravely forward, and continue to polish the golden brand of Zhonglu sports in the field of foreign aid.